The new entrance at West Campus is now paved and ready for use!  The transition from the old entrance to the new entrance will occur tomorrow morning, Wednesday, April 30th.  Fencing will be changed to eliminate confusion between the old and new entrance, and the workers will be on site directing traffic as the change is...

29

Apr
2014

We have received word from the Goleta Water District that there will be a planned water shut off next Thursday, May 1, 2014, at the West Campus Apartments, on the south side of the complex. All water (hot and cold) will be disrupted between the hours of 8am and 5pm in the buildings listed below.

This disruption will...

21

Apr
2014

What’s happening at the Sierra Madre Villages construction site this week:

Paving at the new West Campus/Sierra Madre Court entrance is expected to finish around April 24th.  Once the road is completed traffic will be shifted to the new entrance.  We will notify residents of the new traffic pattern...

18

Apr
2014

We have received word from the Goleta Water District that there will be a planned water shut off next Wednesday, April 23, 2014, at the West Campus Apartments. Given that West Campus has encountered several water shut offs in the past months, GWD is doing everything possible to minimize the impact to residents.  Work will occur...

14

Apr
2014

PLEASE NOTE:
• With the construction activity and narrow fence line on both the North and West sides of the West Campus complex, traffic has been restricted to 1-way only on ALL parts of the perimeter road, including the stretch between Lot 2 and the entrance. 

What’s happening at the Sierra Madre Villages...

07

Apr
2014

What’s happening at the Sierra Madre Villages construction site this week:

Exciting progress continues at building 7 on the north side of the Sierra Madre construction site.  Steel frames for balconies went up last week, and prefabricated walls are expected to go up this week, going from foundation to...

01

Apr
2014

What’s happening at the Sierra Madre Villages construction site this week:

The foundation has been poured on Building 7 (at the northern portion of Sierra Madre), and the framing is now up for the balconies on that building.  The steel frames were pre-fabricated offsite, and installed in just a day!

Paving will...

27

Mar
2014

Update: West Campus/Sierra Madre Court Entrance Relocation and Storm Drain Installation

Note: the start date for paving has changed to Monday, 3/31/14

Starting on Friday, 3/28/14 Monday, 3/31/14, and continuing into next week, paving will begin for the new entrance at...

21

Mar
2014

PLEASE NOTE: This is early information we are receiving about upcoming work.  We will post an update on Monday, 3/24/14, with additional information as we receive it.

What’s happening at the Sierra Madre Villages construction site this week:

West Campus/Sierra Madre...

21

Mar
2014

We have received word from the Goleta Water District that there will be another planned water shut off next Wednesday, March 26, 2014, at the West Campus Apartments. All water (hot and cold) will be disrupted between the hours of 8am and 5pm, and all apartments in the complex will be affected.  This water shut off is due to...