Storke Road

Project Blog posts tagged with Storke Road

26

Nov
2014

Three of the five residential buildings on the main site are fully framed out, with the pre-fabricated walls and roof trusses completed and two of the buildings starting to have roofing and windows installed. A model unit is scheduled to be completed by the end of December. We are looking forward to installing all the appliances and...

17

Oct
2014

The contractor for the Storke Road Improvements project continues to work along Storke Road and is scheduled to complete the trenching and associated patch back work at the entrance to Sierra Madre Court by next Wednesday (10/22). Please continue to follow the temporary detours, posted signs, and related traffic control measures while...

14

Oct
2014

Construction is moving along quickly for all 6 of the buildings on the main Sierra Madre Villages site, with roofing starting to be installed on two of the buildings and concrete floors being poured every week. By the end of October, we should see windows and balcony sliding glass doors starting to be installed on two of the buildings...