Sierra Madre Apartments

Project Blog posts tagged with Sierra Madre Apartments

23

Jul
2015

The project team is working hard to complete all the residential buildings before move-in which is only 8 weeks away! The construction site trailers were removed this past week and all the utilities to and from the buildings are in the process of being established. The new trees, plantings, and irrigation systems are currently being...

20

May
2015

The contractor is quickly moving on completing the exterior of the buildings, with four of the six residential buildings having all windows, siding, and stucco completed and the last two following suit. Once complete with the exterior as well as the two buildings that will house the administrative offices, recreation rooms, fitness...

13

Feb
2015

A paving contractor is scheduled to patch asphalt along the north curb and gutter of Sierra Madre Court this coming Monday (2/16) from 8:30-11:30am. Traffic control will be provided so that residents of West Campus Family Student Housing can enter and exit the complex at all times. Once this work is complete the construction fence at...

26

Nov
2014

Three of the five residential buildings on the main site are fully framed out, with the pre-fabricated walls and roof trusses completed and two of the buildings starting to have roofing and windows installed. A model unit is scheduled to be completed by the end of December. We are looking forward to installing all the appliances and...

14

Oct
2014

Construction is moving along quickly for all 6 of the buildings on the main Sierra Madre Villages site, with roofing starting to be installed on two of the buildings and concrete floors being poured every week. By the end of October, we should see windows and balcony sliding glass doors starting to be installed on two of the buildings...

27

Aug
2014

The contractor is planning to finish paving the small section of road at the southwest corner of West Campus Family Student Housing this Friday (8/29), along with some minor asphalt work including the grinding of the speed bumps in the bicycle lanes. The main area of work will be directly adjacent to Building 730 and...

08

Jul
2014

At approximately 3:30am this past Friday, County Fire, SB Sheriff Deputies, and UC Police Officers responded to the Sierra Madre Apartments construction site on Storke Road for a report of a fire. The buildings are still under construction and are unoccupied. There were three structures that were damaged by fire including a...
12

Jun
2014

Sierra Madre construction is slightly behind schedule. Third floor framing continues along with roofing on family housing building 7, with stair towers and framing starting now on single student bldgs at main site adjacent to WCFSH. The paving of the road was paused in consideration of Finals Week and is set to...
13

May
2014

What’s happening at the Sierra Madre Villages construction site this week:

Paving at the new West Campus/Sierra Madre Court and Storke road entrance has been completed.  All traffic entering/exiting the complex has been transitioned to the new road.  Work continues on either side of the road, adding sidewalks...

29

Apr
2014

What’s happening at the Sierra Madre Villages construction site this week:

Paving at the new West Campus/Sierra Madre Court entrance has been completed.  All traffic entering/exiting the complex will be transitioned to the new road on the morning of Wednesday, April 30th.  Workers will be on site...