KITP Visiting Scholars Residence

Project Blog posts tagged with KITP Visiting Scholars Residence

28

Oct
2015

The core structure of the KITP Residence building is starting to take shape.  A large part of the steel structure that extends from the basement level of the KITP Residence has been erected.  Over the next two weeks, metal decking will be installed.  The metal decking will be secured to the steel structure.  Residents can expect to...

21

Aug
2015

Update: The second concrete pour date has been rescheduled to Wednesday, September 2 instead of Tuesday, September 8 as originally noted below.

There will be some increased activity around the KITP Residence Project on Friday, August 28 and Tuesday, September 8.  During this time, concrete will be placed for...

02

Jul
2015

There will be some increased activity around the KITP Residence Project on Thursday, July 2.  Concrete will begin to be poured in the excavated portion of the site.  A concrete pump will be set up on the western end of the site and concrete trucks will begin to arrive at 7:30am.  We apologize for any noise impact this may have.

...
01

May
2015

A section of bike path located near the Encino Village of San Clemente Villages will be closed starting on Monday, May 4 and is scheduled to be reopened on Monday, May 11.  The contractor working on the KITP Residence project is experiencing a significant increase in water coming into the South-East corner of the project.  They need...

23

Jan
2015

The contractor working on the KITP residential project is currently in the process of installing a dewatering system that will pump out water from the ground beneath the construction site.  This system has to be operational before our next storm comes in, and despite their efforts, they will not be able to complete the work by Friday...

15

Jan
2015

A section of bike path south of the KITP residence construction site will be closed on Friday, January 16 starting at 7:30am and should be re-opened by 9:30am.  The contractor working on the project will be installing dewatering lines along this southern edge during this time.  Please feel free to email campus representative...

14

Jan
2015

The contractor working on the KITP residential project is doing some hydro excavation this week and part of next.  In order to complete this portion of the project on time, the contractor will need to work on Saturday, January 17.  They will be on-site starting at 8am and work until about 4pm.  Hydro excavation involves using high...

18

Dec
2014

San Clemente Water Outage, Encino and Donner Villages – Tuesday, December 23

This upcoming Tuesday, December 23 there will be a scheduled water outage for Encino and Donner Villages. The outage will take place between 9am and 3pm. During this time, construction crews working on the KITP Residence project will tie into the water...

17

Dec
2014

As part of the KITP residence project, the contractor will be installing two water lines and a gas line that will cross the remaining section of parking lot 53.  The two water lines will cross the parking lot and the gas line will cross to a point behind San Clemente.  The gas line will be bored rather than excavated.  There will be a...

12

Nov
2014

The construction company will be doing noisy asphalt demo work this Wednesday morning, 11/12/14, starting at 7am in Lot 53.   We have asked them to not start the noisiest of the work until after 8am.

Please feel free to email Ray.Aronson@dcs.ucsb.edu  if additional...