Infrastructure Renewal Project Update

March 29, 2016

For the remainder of this week (3/28-4/1), a portion of Channel Islands Road (near Lot 8/UCen Road) will close temporarily. Lot 8 will remain open for the rest of this week and can be accessed via Channel Islands Road. The following week (4/4-4/8) Lot 8 will close along with a small portion of Channel Islands Road (directly in front of Lot 8).

Tags: