Infrastructure Renewal Project

Project Blog posts tagged with Infrastructure Renewal Project

10

May
2016

From 5/9-5/20, a section of path between Ortega Dining Commons and San Miguel Residence Hall and the access road behind San Miguel and San Nicolas will be temporarily closed while the new utility lines are installed. Parking Lot 4 will remain temporarily closed. Starting Wednesday, 5/11 several bike racks adjacent to San Nicolas (near...

02

May
2016

Starting this Wednesday, 5/4, a portion of Channel Islands Rd from Lot 4 to the San Nicolas short-term parking will close temporarily through Monday 5/9. This closure will be done in two phases and are shown on the corresponding map. Parking Lot 4 will remain temporarily closed. The Ortega Dining Commons loading dock, Lot 8, and the...

19

Apr
2016

Starting Wednesday, 4/20, a section of bike racks West of Lot 4 and part of the San Miguel lawn near Ortega Dining Commons will be temporarily closed through Wednesday, 4/27. Parking Lot 4 will remain closed through 4/27.

08

Apr
2016

Starting this Monday, 4/11, a portion of Channel Islands Rd (between Ortega Dining Commons and the College of Creative Studies) will close temporarily through Wednesday, 4/13. Lot 8 and the Ortega Dining Commons loading dock will remain open and can be accessed via Channel Islands Road. On Wednesday, 4/13, Lot 4 and one lane of...

29

Mar
2016

For the remainder of this week (3/28-4/1), a portion of Channel Islands Road (near Lot 8/UCen Road) will close temporarily. Lot 8 will remain open for the rest of this week and can be accessed via Channel Islands Road. The following week (4/4-4/8) Lot 8 will close along with a small portion of Channel Islands Road (directly in front...

18

Mar
2016

The Infrastructure Renewal 1B Project is scheduled to complete the work on UCen Road by this week, and starting Monday, March 21 trenching will start along Channel Islands Road between Lot 5 and De La Guerra. While access to the loading docks of DLG will be temporarily blocked for periods of time, the contractor plans to keep parking...

04

Feb
2016

The Infrastructure Renewal 1B Project will officially break ground this coming Monday, February 8. A portion of UCEN Road will be closed intermittently starting Monday through the end of March as shown on the map. The sidewalk to the North of Santa Rosa Hall will remain open as will access to Lot 9 and 2. Parking Lots 3, 4, 5, 6, and...