January, 2015 Blog Posts

25

Jan
2016

Construction is moving along quickly for the entire San Joaquin project! One of the two new 6-story Towers will have the concrete roof deck poured by the end of February, and the second 6-story Tower is scheduled to top out by the end of March. The project currently has two separate cranes working on-site, with one crane loading...