October, 2015 Blog Posts

28

Oct
2015

The core structure of the KITP Residence building is starting to take shape.  A large part of the steel structure that extends from the basement level of the KITP Residence has been erected.  Over the next two weeks, metal decking will be installed.  The metal decking will be secured to the steel structure.  Residents can expect to...