The contractor is planning to finish paving the small section of road at the southwest corner of West Campus Family Student Housing this Friday (8/29), along with some minor asphalt work including the grinding of the speed bumps in the bicycle lanes. The main area of work will be directly adjacent to Building 730 and...

22

Aug
2014

The paving and associated sitework outside the Sierra Madre project fence adjacent to the West Campus Family Student Housing community is quickly wrapping up, with the striping of the two lanes all the way down Sierra Madre Court and the west perimeter road scheduled for this coming Monday (8/25). In addition, the...

08

Aug
2014

The paving of Sierra Madre Court has been scheduled for next Wednesday (8/13) through Friday (8/15), with some minor concrete work scheduled for this Saturday in order to allow enough time to dry and set, in preparation for the asphalt. Once this work is complete, the road between the Sierra Madre construction site and our West Campus...